The bean bags are done. They took longer than expected because I read that it is wise to actually put a liner inside the bag. So essentially i made two sets of bean bags. They are a big hit. I let Ashton stay up late to play with them.
10.20.2010
Slowly but surely...
See Dad my projects are coming along just fine.
The bean bags are done. They took longer than expected because I read that it is wise to actually put a liner inside the bag. So essentially i made two sets of bean bags. They are a big hit. I let Ashton stay up late to play with them.
The other 2 projects may have to wait a little. We've been busy. For example, we found out that we can not only fit 3 but 4 kids on my Bob Stroller. Ashton normally straddles the whole front foot rest but he was willing to scooch over so Atticus could have a ride on our sweet diggs to the Richardson HS Homecoming Parade. Who needs a triple stroller or even a quad stroller for that matter!
The bean bags are done. They took longer than expected because I read that it is wise to actually put a liner inside the bag. So essentially i made two sets of bean bags. They are a big hit. I let Ashton stay up late to play with them.
Subscribe to:
Post Comments (Atom)
1 comment:
Nice work Sammie. I found your blog :) and the smile is because I commented. Email me and I'll let you into my boring blog world.
Post a Comment